Bathroom Remodel – Total Price $6,000

PROJECT INFO

COMPLETION TIME

0
DAYS

You guys are awesome. Thank you Frank. The bathroom came out beautiful.

EMILY, 190 WADSWORTH AVENUE - COOP OWNER

BEFORE & AFTER PICTURES

BEFORE REMODELAFTER REMODEL
BEFORE REMODELAFTER REMODEL
BEFORE REMODELAFTER REMODEL

PROJECT DESCRIPTION

  • Installation of 52 Square Feet of Carrara Porcelain Floor Tile

  • Installation of 120 Square Feet of Marble Wall Tile including the window

  • Installation of exposed two handle shower system with rain shower head

  • Installation of new walls

  • Installation of new wall mounted vanity and sink

  • Installation of new dual flush elongated toilet

  • Installation of new towel rod, toilet holder, curtain rod, towel hook

  • Installation of new vanity sink faucet and drain

  • Prime and Painting of walls and ceiling (2 Colors)

  • Glazing of bathtub

PROJECT CHALLENGES

  • With the owners and 4 dogs staying in the apartment during the remodel, we were required to keep the toilet, tub and shower operational during the entire remodeling, which meant that we had to keep reinstalling the toilet and shower system for their daily use. 

  • Scope of work did not include plumbing, but because there wasn’t any shut off valves in the bathroom and the water had to be shut off from the building by the super, we installed shut off valves as a courtesy to the owners and building super.

  • An entire wall wall was painted a dark color and it took us one entire day to prime the wall so that the dark color did not permeate the new silver white paint color.

  • Client had ordered and purchased tile quantities that were incorrect and so we drove out to Floor and Decor in New Jersey late in the evening to purchase new tiles and correct quantities, rather than waiting and delaying the job for a reorder.